T1 - Integrated project delivery with BIM: an automated EVM-based approach
AU - Elghaish, Faris Ali Khairy
AU - Abrishami, Sepehr
AU - Hosseini, M. R.
AU - Abu-Samra, Soliman
AU - Gaterell, Mark
PY - 2019/10
Y1 - 2019/10
N2 - The Integrated Project Delivery (IPD) in integration with Building Information Modelling/Management (BIM) is an optimal approach for delivering construction projects. This is, however fraught with complications, due to the inability of current cost management practices to determine fair risk/reward ratio in IPD arrangements. Previous research has established the advantages of Earned Value Management-based (EVM) method for risk/reward sharing, as well as, how Activity Based Costing (ABC) method can facilitate automating the sharing process. This study proposes an innovative approach to exploit the capabilities of these techniques coupled with BIM in automating/optimising the process of IPD risk/reward sharing. This includes providing mathematical equations for risk/reward sharing and developing a model that strengthens IPD parties' relationships. The process is enhanced through developing an EVM-Web grid that enables the participants to easily track their costs on computers and mobile devices. To demonstrate the applicability and validity of the proposed model, it is applied on a real-life case and displays promising results in terms of flexibility in allocating risk/reward for varying scenarios.
AB - The Integrated Project Delivery (IPD) in integration with Building Information Modelling/Management (BIM) is an optimal approach for delivering construction projects. This is, however fraught with complications, due to the inability of current cost management practices to determine fair risk/reward ratio in IPD arrangements. Previous research has established the advantages of Earned Value Management-based (EVM) method for risk/reward sharing, as well as, how Activity Based Costing (ABC) method can facilitate automating the sharing process. This study proposes an innovative approach to exploit the capabilities of these techniques coupled with BIM in automating/optimising the process of IPD risk/reward sharing. This includes providing mathematical equations for risk/reward sharing and developing a model that strengthens IPD parties' relationships. The process is enhanced through developing an EVM-Web grid that enables the participants to easily track their costs on computers and mobile devices. To demonstrate the applicability and validity of the proposed model, it is applied on a real-life case and displays promising results in terms of flexibility in allocating risk/reward for varying scenarios.
KW - building information modelling
KW - BIM-IPD
KW - Construction procurement
KW - 5D
KW - IPD cost
UR - https://www.sciencedirect.com/science/article/pii/S0926580518309002
U2 - 10.1016/j.autcon.2019.102907
DO - 10.1016/j.autcon.2019.102907
M3 - Article
SN - 0926-5805
VL - 106
JO - Automation in Construction
JF - Automation in Construction
M1 - 102907
ER -