Project Details
Description
To provide SafteyOn (G+) with considerations for designing floating offshore wind turbines.
Key findings
As a result of this work, a scoping review was delivered to the offshore wind industry, outlining the considerations for humans when designing floating wind turbines.
Status | Finished |
---|---|
Effective start/end date | 1/09/23 → 31/12/23 |
Funding
- The Energy Institute: £12,485.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.